Project Documents List

Project documents that have been submitted to DMMO appear in the list below.  Each document may be viewed or downloaded by clicking on it.

Documents that have been approved by DMMO have a "certificate" icon in the Status column.  Projects not yet approved by DMMO may be drafts or otherwise subject to change, and should be viewed with caution.

Documents

Search Filter:
 TitleEvent NameTypeFor ConsiderationStatusDocument DateUploader
Contra Costa Water District Mallard Slough Pump Station Project 2022 CCWD Mallard Intake ChannelTier1 Yes 2022-03-02 shelahs
Contra Costa Water District SAR 2021 2021 CCWD Mallard Intake ChannelSAR No 2021-01-20 unknown
Sediment Characterization SAP for the Dredging of Sediment from the Contra Costa Water District''''''''s Mallard Slough Intake Channel 2021 CCWD Mallard Intake ChannelSAP No 2020-10-14 unknown
SAR for Mallard Intake Channel 2010 Sep 2010 CCWD Mallard Intake ChannelSAR No 2010-09-01 PLM
.