Return to Projects List

To choose a different project, click here.

Access Project Documents and Data

Use the Project Quick Links below to see or download this project's Permit History, a summary of DMMO Suitability Determinations, and any Documents submitted to DMMO such as Sampling and Analysis Plans (SAPs) and Sampling and Analysis Results (SARs).

You may also view and download past Testing Results for this project in two ways: (1) view testing data from different testing episodes using the "Dredging Events/Status" list below Project Quick Links; or (2) refine your search and query for specific data types using the Project Test Data link at the left of the page.

Dredging Events/Status

 
Search Filter:
  Event NameEvent TypeProp. Depth (ft, MLLW)Over Depth (ft)Prop. Vol. (est. cy)Actual Vol. (in situ, cy)Comments 
NEW Add new event here Maint 0.00.000
2024 Chevron Richmond Long Wharf Maint 50.02.0250,0000
2022 Chevron Richmond Long Wharf Maint 50.02.0170,177112,069
2021 Chevron Richmond Long Wharf Maint 50.02.0250,00071,151 BERTH 1, 4: -50ft ML...
2020 Chevron Richmond Long Wharf Maint 50.02.0150,00096,093
2019 Chevron Richmond Long Wharf Maint 50.02.0169,33365,648 Brths 1 & 4: -50ft +...
2018 Chevron Richmond Long Wharf Maint 50.02.0150,00052,529 SF-10: 10,100cy; MWR...
2017 Chevron Richmond Long Wharf Maint 50.02.0191,500149,954 Depths -15 to -50 +2...
2016 Chevron Richmond Long Wharf Maint 50.02.0100,00038,565 Depths from -15 to -...
2015 Chevron Richmond Long Wharf Maint 50.02.0150,000105,735
 

Query Checked Events: Go

     

 
123
Point of Contact
Chevron USA Inc. Richmond Refinery
Address
PO Box 1272
Richmond
94802
510/242-3308
County
Contra Costa
Waterway
Central San Francisco Bay
Email
Comment

.